How to choose transformer capacity when buying a transformer?
May 09, 2021
Leave a message
The transformer is the key equipment in the power transmission system, and its main function is to step up or step down to facilitate the reasonable transmission, distribution and use of electrical energy. Therefore, the correct and reasonable selection of the type, number and capacity of transformers is an important issue in power transmission. The following article introduces the selection of transformer capacity based on the requirements of relevant power transmission standards and conventional design experience.
1. How to choose a transformer
So how to accurately select the transformer capacity to ensure the reliable operation of power transmission? If the transformer capacity is selected too large, it will form a "big horse-drawn cart" phenomenon, which not only increases equipment investment, but also keeps the transformer in a no-load state for a long time , Increase the reactive power loss; if the transformer capacity is selected too small, the transformer will be in an overload state for a long time, and the transformer will be easily burned.
The load factor of the transformer is between 0.5 and 0.6, and the efficiency is the highest. At this time, the capacity of the transformer is called the economic capacity. If the load is relatively stable, the capacity of the transformer can be selected according to the economic capacity for continuous production; for special transformers that only supply power to power loads such as drainage and irrigation, the capacity of the transformer can generally be selected according to 1.2 times the nameplate power of the asynchronous motor; the starting current of the general motor is At 4-7 times the rated current, the transformer should be able to withstand this impact. The capacity of the largest one of the motors that can be started directly should generally not exceed about 30% of the capacity of the transformer. It should be pointed out that the special transformer for drainage and irrigation should not be connected to other loads in order to stop operation in time during the non-drainage and irrigation period to reduce power loss.
For the selection of comprehensive power transformer capacity for power supply, lighting, agricultural and sideline product processing, etc., the simultaneous power of the electrical equipment must be considered. The capacity of the transformer can be selected at 1.25 times the actual maximum load that may occur. According to the characteristics of scattered users of rural power grids, low load density, seasonal load and strong intermittentity, the capacity-adjusting transformer can be used. The capacity-adjusting transformer is a transformer that can adjust the capacity without load according to the size of the load. It is suitable for use in locations with obvious seasonal changes in the load.
For substations or industrial and mining enterprises with a large power load, the power supply method of mother and child transformers is generally adopted. One (parent transformer) is configured according to the maximum load, and the other (sub transformer) is selected according to the low load state, which can greatly improve The utilization of distribution transformers reduces the no-load loss of distribution transformers.
In view of the fact that some distribution transformers in rural areas are operating at low load for a long time in addition to a small amount of peak power load during the year, for users with conditions, the power supply mode of parallel operation of mother and child transformers or transformers can also be used. When the load changes greatly, according to the principle of lowest power loss, put in transformers of different capacities.
2. Calculation of transformer capacity selection
1 Transformer nameplate capacity indication
The capacity of a transformer is a unit of power (apparent power), expressed in VA (Volt-Ampere) or KVA (KVA). It is the product of the AC voltage and the effective value of the AC current, and the calculation formula S=UI. The rated capacity of the transformer will be marked on its nameplate.
To choose a transformer, it is necessary to know how large a transformer is to be used. This is usually considered based on the actual load of the power system. A power supply system, after calculation, select the capacity of the transformer according to the calculated load S. For a single transformer that uses temporary electricity (on a construction site) and supplies power with a steady load, the load rate is generally about 85%. The transformer capacity is about 1.15 times the calculated load. For permanent power supply systems, the load rate of the transformer is generally 60% to 70%. However, the rated capacity of the transformer is manufactured according to a certain grade, so when selecting it, the capacity should be similar and larger than the calculated grade specification.
At the same time, it should be noted that the capacity of a single transformer should not be greater than 1000kVA. When the load is large, several transformers can be used for power supply in parallel. Parallel operation should meet the conditions of equal transformation ratio, the same connection group, and the same short-circuit voltage. Secondly, pay attention to the problem of load distribution. Generally, the ratio of the maximum capacity to the minimum capacity should not exceed 3:1.
2 Maximum power per phase of transformer load
The load power of each phase of A, B, and C is added independently, for example, the total power of A-phase load is 10kW, the total power of B-phase load is 9kW, and the total power of C-phase load is 11kW, the maximum value is 11kW. The power of each single-phase device is calculated according to the maximum value on the nameplate. The power of the three-phase device is divided by 3, which is equal to the power per phase of this device.
For example: C-phase load total power = (computer 300W X 10 units) + (air conditioner 2kW X 4 units) = 11kW
3 Total three-phase power of transformer
The three-phase total power of the transformer is 11kW X 3 phase=33kW. The three-phase total power/0.8 is the most important step. At present, more than 90% of the transformers sold on the market have a power factor of 0.8, so it needs to be divided by a power factor of 0.8.
The total power of the transformer is 33kW/0.8=41.25kW. Transformer total power/0.85. According to the "Power Engineering Design Manual", the transformer capacity should be selected according to the calculated load. For a single transformer that supplies power to a stable load, the load rate is generally about 85%.
The power level of the transformer that needs to be configured is 41.25kW/0.85=48.529kW, so you can choose a 50KVA transformer when purchasing.